By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Health Works CollectiveHealth Works CollectiveHealth Works Collective
  • Health
    • Mental Health
  • Policy and Law
    • Global Healthcare
    • Medical Ethics
  • Medical Innovations
  • News
  • Wellness
  • Tech
Search
© 2023 HealthWorks Collective. All Rights Reserved.
Reading: Bellevue Hospital Evacuation Still Underway as Reserve Power Stopped Working And No Plumbing
Share
Notification Show More
Font ResizerAa
Health Works CollectiveHealth Works Collective
Font ResizerAa
Search
Follow US
  • About
  • Contact
  • Privacy
© 2023 HealthWorks Collective. All Rights Reserved.
Health Works Collective > News > Bellevue Hospital Evacuation Still Underway as Reserve Power Stopped Working And No Plumbing
News

Bellevue Hospital Evacuation Still Underway as Reserve Power Stopped Working And No Plumbing

BarbaraDuck
BarbaraDuck
Share
3 Min Read
SHARE

This is the longest operating hospital in the US and the pride ofimageNew York.

This is the longest operating hospital in the US and the pride ofimageNew York. If the hospital can re-open in 2 or e 3 weeks it will be doing good with the extensive damage suffered.  There were over 700 patients in the hospital when the evacuation began, including several prisoners there for medical treatment .  The national guard was called in to form a bucket brigade to get fuel to the generators.  There was no power and plumbing.  Patients were transported to several other hospitals in the area.

Visit NBCNews.com for breaking news, world news, and news about the economy

More Read

Ribs on BBQ
Meat and Mortality: Does Eating Meat Decrease Your Lifespan?
Unnoticeable Injuries and Their Surprising Effect on Soldiers
Competition, Investment and Markets in Cell Therapy, Tissue Engineering
Patient Engagement Explored at the ePharma Summit
What Are the Hidden Dangers of Varicose Veins?

NEW YORK (AP) — Flood damage at Bellevue Hospital is so extensive and severe that a full evacuation of patients was necessary, the president of the New York City Health and Hospitals Corporation said Wednesday, adding that the facility would be “doing very well” if it’s able to reopen in even two or three weeks.

The hospital had moved out more than 400 patients by Wednesday evening and hoped to have the remaining 300 evacuated by noon Thursday, HHC President Alan Aviles said.

Bellevue lost power during Monday night’s massive storm and had been operating on backup generators since then.

The National Guard helped carry some of the patients in more serious condition down as many as 18 flights of stairs, and on Wednesday, it became clear that the damage was so much that all of the patients needed out, Aviles said.

He said Bellevue, which he said was the longest-operating hospital in the country, had never experienced anything like this.

“Irene did not come close to creating a problem,” he said, referring to last year’s storm. He said the hospital sits about 20 feet above sea level, so “although we certainly prepared for the possibility, it seemed like it was relatively remote given” all of the projections about how high the storm surge would go.

http://www.sfgate.com/business/energy/article/Restoration-at-Bellevue-Hospital-could-take-weeks-3997312.php#ixzz2Aw9tivuW


  

TAGGED:Bellevue Hospital
Share This Article
Facebook Copy Link Print
Share

Stay Connected

1.5KFollowersLike
4.5KFollowersFollow
2.8KFollowersPin
136KSubscribersSubscribe

Latest News

foot and vein health
The Hidden Connection Between Foot and Vascular Health
Health
January 8, 2026
CRM Software for healthcare
A Beginner’s Guide to Medical CRM Software for Clinics, Medspas, and Telehealth
Global Healthcare Technology
December 29, 2025
The Evolving Role of Nurse Educators in Strengthening Clinical Workforce Readiness
Career Nursing
December 22, 2025
back health
The Quiet Strain: How Digital Habits Are Reshaping Back Health
Infographics
December 22, 2025

You Might also Like

genetic screening
BusinessNews

GenePeeks Tests and Screens Virtual Progeny

October 8, 2013
News

Greetings From Your Town, USA

July 4, 2012

Pfizer Has a New Sales Strategy–Will Be Selling Lipitor at Generic Prices When Patent Runs Out

November 22, 2011

Diagnosed with Leukemia? Are You Sure?

April 3, 2013
Subscribe
Subscribe to our newsletter to get our newest articles instantly!
Follow US
© 2008-2025 HealthWorks Collective. All Rights Reserved.
  • About
  • Contact
  • Privacy
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?