By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Health Works CollectiveHealth Works CollectiveHealth Works Collective
  • Health
    • Mental Health
  • Policy and Law
    • Global Healthcare
    • Medical Ethics
  • Medical Innovations
  • News
  • Wellness
  • Tech
Search
© 2023 HealthWorks Collective. All Rights Reserved.
Reading: Bellevue Hospital Evacuation Still Underway as Reserve Power Stopped Working And No Plumbing
Share
Notification Show More
Font ResizerAa
Health Works CollectiveHealth Works Collective
Font ResizerAa
Search
Follow US
  • About
  • Contact
  • Privacy
© 2023 HealthWorks Collective. All Rights Reserved.
Health Works Collective > News > Bellevue Hospital Evacuation Still Underway as Reserve Power Stopped Working And No Plumbing
News

Bellevue Hospital Evacuation Still Underway as Reserve Power Stopped Working And No Plumbing

BarbaraDuck
BarbaraDuck
Share
3 Min Read
SHARE

This is the longest operating hospital in the US and the pride ofimageNew York.

This is the longest operating hospital in the US and the pride ofimageNew York. If the hospital can re-open in 2 or e 3 weeks it will be doing good with the extensive damage suffered.  There were over 700 patients in the hospital when the evacuation began, including several prisoners there for medical treatment .  The national guard was called in to form a bucket brigade to get fuel to the generators.  There was no power and plumbing.  Patients were transported to several other hospitals in the area.

Visit NBCNews.com for breaking news, world news, and news about the economy

More Read

No Savings from Raising Medicare Age
How to Choose a Bank as a Chiropractor
3 Ways that Crowdfunding Can Benefit the Healthcare Market
A Hybrid That Does More With Less
4 Advances In Wound Care Treatment

NEW YORK (AP) — Flood damage at Bellevue Hospital is so extensive and severe that a full evacuation of patients was necessary, the president of the New York City Health and Hospitals Corporation said Wednesday, adding that the facility would be “doing very well” if it’s able to reopen in even two or three weeks.

The hospital had moved out more than 400 patients by Wednesday evening and hoped to have the remaining 300 evacuated by noon Thursday, HHC President Alan Aviles said.

Bellevue lost power during Monday night’s massive storm and had been operating on backup generators since then.

The National Guard helped carry some of the patients in more serious condition down as many as 18 flights of stairs, and on Wednesday, it became clear that the damage was so much that all of the patients needed out, Aviles said.

He said Bellevue, which he said was the longest-operating hospital in the country, had never experienced anything like this.

“Irene did not come close to creating a problem,” he said, referring to last year’s storm. He said the hospital sits about 20 feet above sea level, so “although we certainly prepared for the possibility, it seemed like it was relatively remote given” all of the projections about how high the storm surge would go.

http://www.sfgate.com/business/energy/article/Restoration-at-Bellevue-Hospital-could-take-weeks-3997312.php#ixzz2Aw9tivuW


  

TAGGED:Bellevue Hospital
Share This Article
Facebook Copy Link Print
Share

Stay Connected

1.5kFollowersLike
4.5kFollowersFollow
2.8kFollowersPin
136kSubscribersSubscribe

Latest News

sunlit portrait with delicate lace shadows
Dr. Michael Piepkorn: Understanding The Genetic Links Behind Familial Skin Cancer
Skin
December 17, 2025
post-surgical recovery
Your Guide To Key Milestones In At Home Post-Surgical Recovery
Health Infographics
December 14, 2025
Dehydration Poses Serious Risks For Older Adults
Why Dehydration Poses Serious Risks For Older Adults
Infographics Senior Care
December 14, 2025
care settings
Hidden Risks In Care Settings: Who Faces The Greatest Threat From Healthcare-Associated Infections
Global Healthcare Health care Infographics
December 14, 2025

You Might also Like

There’s a MERS Patient in Your Hospital: Now What?

May 21, 2014
medical staff
BusinessGlobal HealthcareHospital AdministrationNewsNursing

The Simple Things Which Help Medical Staff

November 24, 2021

Mobilizing Stakeholders For Better Health, Better Care And Lower Costs

April 13, 2012
Image
DiagnosticsMedical InnovationsNewsRadiology

Cutting the Cord in Ultrasound Systems

November 28, 2012
Subscribe
Subscribe to our newsletter to get our newest articles instantly!
Follow US
© 2008-2025 HealthWorks Collective. All Rights Reserved.
  • About
  • Contact
  • Privacy
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?